If you are thinking of coming to Bath from 14th April 2012 then maybe think again. Below are details of the closure of one of the main bridges into the city. The next three weeks are going to be fun!
CHURCHILL BRIDGE, BATH
(TEMPORARY PROHIBITION OF USE BY VEHICLES) (TEMPORARY PROHIBITION OF USE BY PEDESTRIANS) ORDER 2012
Notice
is hereby given that the Bath and North East Somerset Council in
pursuance of the provisions of section 14 of the Road Traffic Regulation
Act 1984 as amended intends to make an order the effect of which will
be to close temporarily to vehicles and pedestrians the entire length of
Churchill Bridge, between A36 Lower Bristol Road & A367 Broad Quay.
|
This order is required because works are being or are proposed to be executed on or near the road consequent upon bridge deck refurbishment and will be operative from the 14th April 2012 for
a maximum period of six months. However, the restrictions may not be
effected for the whole of the period but it is anticipated that the road will
be restricted as and when traffic signs are in position and only for so
long as is necessary to execute the works which it is anticipated will
be for TWENTY ONE DAYS.
ALTERNATIVE ROUTE – Motorised Vehicles- clockwise-
A36 Lower Bristol Road, A36 Claverton Street, A367 Wells Road, A36
Lower Bristol Road, A36 Pines Way, B3118 Midland Bridge Road, A367 Green
Park Road, A357 Avon Street, A367 Corn Street, A367 St James Parade,
A367 Southgate Street, A367 Broad Quay. Anticlockwise- A367 Broad Quay, A367 Green Park Road, B3118 Midland Bridge Road, A36 Pines Way, A36 Lower Bristol Road.
For Pedestrians- A36 Lower Bristol Road, Southgate Footbridge, Broad Quay (cyclists who wish to use pedestrian diversion route will be required to dismount before using the Southgate Footbridge).
|
No comments:
Post a Comment